Oregon Department of Environmental Quality
Baron Blakeslee
General Site Information
Site:
Baron Blakeslee (ECSI Site ID: 1274)
CERCLIS (EPA) Id
061483384
Project Manager:
Anna Coates
Investigative Status:
Listed on the Confirmed Release List or Inventory
PM Phone:
(503) 229-5213
NPL
(National Priority Listing):
No
Address:
5920 NE 87th Ave.
Is this site an Orphan?
No
Portland
,
97220
Is this site a brownfield?
No
County:
MULTNOMAH
Action Underway or Needed:
REMEDIAL ACTION
Region:
Northwest Region
Click for more details ...
NOTE: This site has one or more long-term controls designed to manage site risks.
Click here
for details.
Site Documents
Click the link to view the document.
File Name
Category
File Size MB
Document Date
Upload Date
June 10 2010 Cleanup Authorization Dischrge Permit.pdf
Correspondence
0.2972
3/4/2014
Proposed Compliance Changes and Clarifications 100713.pdf
Correspondence
0.1395
10/6/2014
Final cNFA Soil Cleanup_PublicNotice-RequestForComments (1).pdf
Correspondence
0.0322
9/29/2015
9/29/2015
Approval InSitu Chemical Oxidation Work Plan 06 14 2021.pdf
Correspondence
0.2419
6/14/2021
6/14/2021
Approval Suspension Discharge Permit 05 03 2023 AC KT.pdf
Correspondence
0.2585
5/3/2023
5/3/2023
2005_Human_Health_Risk_Assessment_ADDENDUM.pdf
Eco/HH Risk Assessments
5.4035
3/20/2014
2023.05.09 Baron Blakeslee 2022 Annual Report Review.pdf
Memos
4.2073
5/9/2023
5/22/2023
Honeywell International Final Consent Order.pdf
Miscellaneous
3.4125
3/31/2009
Investigation History BB Honeywell 1990 to 2007.pdf
Miscellaneous
0.0969
7/23/2015
7/23/2015
Baron Blakeslee Final Permit Sept 26 2019.pdf
Miscellaneous
4.2664
9/26/2019
2/26/2021
Outfall-pipeline Design Basis Report_FINAL_ALL.pdf
Reports
4.2994
12/13/2012
GW Extraction and Treatment System Construction Completion Rpt. (Aug. 2013).pdf
Reports
0.1854
11/5/2013
GW Extraction and Treatment System Construction Completion Appendices B-F (Aug. 2013).pdf
Reports
5.8065
11/5/2013
2014 GW Plume.pdf
Reports
2.2994
3/3/2014
Groundwater Monitoring Report November 2012 (June 2013).pdf
Reports
13.2578
6/1/2013
12/24/2014
Offsite Soil Excavation Construction Completion Report (February 14 2013).pdf
Reports
6.2862
2/14/2013
12/24/2014
4th Quarter 2013 (January 15 2014).pdf
Reports
1.1993
1/15/2014
12/24/2014
1st Quarter 2014 (April 15 2014).pdf
Reports
3.6221
4/15/2014
12/24/2014
2nd Quarter 2014 (July 15 2014).pdf
Reports
2.3829
7/15/2014
12/24/2014
3rd Quarter 2014 (October 15 2014).pdf
Reports
4.3789
10/15/2014
12/24/2014
Soil Excavation Construction Completion Report (March 2012).pdf
Reports
8.7206
3/1/2012
12/24/2014
37893_2015POCT12_CH2_Q3GWETSDISCHARGEREPORT.pdf
Reports
2.9309
10/12/2015
10/14/2015
2016JAN15_CH2_Q4GWETSDISCHARFEREPORT.pdf
Reports
4.5511
1/5/2016
1/19/2016
GW Extraction and Tx System Perf Monitoring & Eval July-Dec 2015 Rpt (Text).pdf
Reports
0.2768
2/1/2016
3/8/2016
GW Extraction and Tx System Perf Monitoring & Eval July-Dec 2015 Rpt (Tbls & Figs).pdf
Reports
5.3650
2/1/2016
6/1/2016
2nd Qtr 2016 _JUL_OMM_16Q2 DEQ Discharge Report.pdf
Reports
2.1474
7/1/2016
7/19/2016
2008 Revised Feasibility Study Report.pdf
Reports
12.4083
3/20/2008
9/1/2017
First Five-Year ROD Review (2-5-14).pdf
Reports
5.9464
2/5/2014
9/1/2017
GW Extraction and Tx System Perf Monitoring & Eval July-Dec 2015 Rpt (Appendices A toE).pdf
Reports
18.0656
2/1/2016
9/13/2017
GWETS_Performance_Monitoring_Report (February 2015) No Figures.pdf
Reports
15.5179
2/2/2015
9/13/2017
37893_2015-08-14_CH2M_Jan-June2015GW_Rep.pdf
Reports
14.6311
8/14/2015
9/13/2017
37893 Portland_2020 Feb_2019 Annual Report_text_tables_figures.pdf
Reports
8.5533
2/1/2019
10/29/2020
37893 Portland_2023Jan_4Q22Qrtly Report.pdf
Reports
0.2451
1/14/2023
1/18/2023
37893 Portland_2023Jan_4Q22 GWETS Effluent Discharge Report.pdf
Reports
0.0290
1/17/2023
1/18/2023
37893 Portland_2023 Feb_2022 Annual Report.pdf
Reports
16.0326
2/28/2023
3/1/2023
Honeywell ROD and Tbls.pdf
RODs/Staff Reports
0.2832
7/20/2010
Honeywell Figures.pdf
RODs/Staff Reports
4.3782
7/20/2010
Staff Memorandum for No Further Action Determination (September 30 2015).pdf
RODs/Staff Reports
2.5670
10/1/2015
10/1/2015
Second Five-Year Record of Decision Review Report (March 2019) reduced size.pdf
RODs/Staff Reports
17.5553
3/1/2019
7/20/2020
Conditional No Further Action Determination for Soil (November 10 2015).pdf
Signed NFA letters
1.1971
11/10/2015
11/12/2015
Figure_26_Cross-sectionEE_rv4_1-15_revised.pdf
Site Diagrams
0.1176
3/19/2015
3/19/2015
Figure_25_Cross-sectionCC_rv4_1-15_revised.pdf
Site Diagrams
0.1254
3/19/2015
3/19/2015
Figure_24_Cross-sectionAA_rv4_2-5_revised.pdf
Site Diagrams
0.1865
3/19/2015
3/19/2015
Soil Design Basis Report_101811_ALL.pdf
Work Plans
7.1884
10/18/2011
9/7/2017
R37893 Portland_2020 Aug_ISCO WP Addendum.pdf
Work Plans
2.3943
8/1/2020
9/17/2020
Honeywell ISCO WP_2019 Jun_.pdf
Work Plans
4.7346
6/1/2019
6/7/2023
Photographs
Click on the Photograph to see a larger version.
former Baron-Blakeslee building and locking gate
9/1/2011
drum storage area.
9/1/2011
building demolition
9/1/2011