Summary Information
(last updated on: 10/31/2013 2:38:04 PM)
In October 2012, the Tualatin Hills Park & Recreation District (THPRD) completed the remedial actions required in the May, 2011 Record of Decision and presented in the September 2012 Remedial Action Plan. Remedial actions completed at the site included:
- Decommissioning groundwater monitoring wells MW-4 and MW-6.
- Excavating surface soil in the vicinity of the former fuel island and surface and subsurface soil to a depth of 10-12 feet in the NE Corner of the property.
- Pumping groundwater from the exavated areas and disposing of impacted groundwater in accordance with local and state law.
- Amending soil and groundwater in the excavated areas with ORC-Advanced oxygen amendment product.
- Restoring the site to grade by importing soil and backfill material that meets clean fill criteria.
Certificate of Completion and a proposed conditional No Further Action determination was made available for public notice and comment in September, 2013. No comments were received.
The Certificate of Completion was filed with Washington County on Octopber 21, 2013. The site will be issued a Conditional No Further Action determination in October, 2013.
Site: |
Farmington Texaco (Former) (ECSI Site ID: 5546) |
CERCLIS (EPA) Id | |
Project Manager: |
N/A - Project Completed. |
Investigative Status: | Listed on the Confirmed Release List or Inventory |
PM Phone: |
|
NPL(National Priority Listing): | No |
Address: |
13660 SW Farmington Rd. |
Is this site an Orphan? | No |
| Beaverton,
97005 |
Is this site a brownfield? | Yes |
County: |
WASHINGTON |
Action Underway or Needed: |
No Further Action (Conditional) |
Region: |
Northwest Region |
Click for more details ... |
|
NOTE: This site has one or more long-term controls designed to manage site risks.
Click here for details.
|
|
View of former location of gas station. Looking southwest from the corner of Farmington Road and Menlo Road.
|
11/14/2013
|
|
|
View of former location of gas station (grassy lot behind Eichler Park sign). View facing east.
|
11/14/2013
|
|
|
View of excavation of contaminated soil, performed in October, 2012.
|
7/31/2012
|
|
|
View facing southwest. Site preparation for remedial action.
|
7/31/2012
|
|