|
Excavation and removal of leaking USTs.
|
12/6/2004
|
|
|
Tank pit following UST removal; contamination of shallow groundwater visible.
|
12/10/2004
|
|
|
Groundwater treatment (aeration) unit.
|
12/10/2004
|
|
|
Weathered gasoline is mixed in the excavation with impacted soil, prior to loading onto trucks for disposal at Hillsboro Landfill.
|
12/10/2004
|
|
|
Trackhoe excavating the area formerly occupied by the pump island.
|
12/21/2004
|
|
|
The "after" picture - brownfield transformation into a coffee shop is complete!
|
9/7/2006
|
|