Instructions: Fees for DEQ Registration or Permit Applicants
- These fees are for facilities not previously permitted and do
not apply to permit renewals or expansions of a currently permitted
site.
- Find the type of permit you desire, below, to determine the
amount of the application processing fee. In most cases, the first
year’s annual compliance fee will be due at the same time as the
application fee (see details in table on reverse).
- Submit the application processing fee with the permit
application (and compliance fee, if required) for each new permit.
- Make your check payable to "Oregon DEQ."
- Note: Most permits/registrations are issued for up to 10
years. Short-term projects may qualify for a letter authorization;
call DEQ.
| Type
of facility: |
Application Processing Fee |
| Transfer station or
material recovery facility Reference: OAR 340-097-0120. |
- Receiving over 50,000 tons of solid waste per year:
- Receiving between 10,000 and 50,000 tons of solid waste
per year:
- Receiving less than 10,000 tons of solid waste per year:
|
$500
$200
$100 |
| Composting facility
Reference: OAR 340-097-0120. |
| Environmental risk screening fee |
$150 |
|
Plan review/approval fee |
|
- Receiving between >100 and <3,500 tons per year
- Receiving between >3,500 and <7,500 tons per year
- Receiving between >7,500 and <10,000 tons per year
- Receiving between >10,000 and <50,000 tons per year
- Receiving >50,000 tons per year
|
$500
$750
$1,000
$2,000
$5,000 |
|
Engineering review fee (if required) |
$500 |
| Waste
Tire Management Reference: OAR Chapter 340, Division 64. |
$100 or $250
(see Reference) |
| Solid Waste Treatment
Facility or Landfill Reference: OAR 340-097-0110 and
340-097-0120. |
| Municipal solid waste landfill, construction
and demolition landfill, incinerator, energy recovery facility,
solid waste treatment facility, off-site industrial facility or
sludge disposal facility: |
- Designed to receive over 7,500 tons of solid waste per
year:
- Designed to receive less than 7,500 tons of solid waste
per year:
|
$10,000
$5,000 |
| Captive industrial facility: |
$1,000 |
| Solid Waste Letter
Authorization Reference: OAR 340-097-0120(2)(d) |
- New Site:
|
$500 |
|
Type of facility |
Annual Compliance Fee |
| Transfer station or
material recovery facility: Reference: OAR 340-097-0110
(5)(a)(D) and 340-097-0120 (3). |
- Receiving over 50,000 tons of solid waste per year
- Receiving between 10,000 and 50,000 tons of solid waste
per year
- Receiving less than 10,000 tons of solid waste per year
|
$1,000
$500
$50 |
| Composting facilities:
Reference: OAR 340-097-0120 (6). |
| Composting Permit |
|
- Receiving >50,000 tons per year
- Receiving between >7,500 and <50,000 tons per year
- Receiving between >3,500 and <7,500 tons per year
- Receiving between >100 and <3,500 tons per year
|
$5,000
$1,000
$500
$100 |
| Registration Permit |
$0 |
When is the fee due? For the first fiscal year’s
operation, the entire compliance fee shall apply if the facility
is placed into operation on or before April 1. Any new facility
placed into operation after April 1 shall not owe a permit
compliance fee until the Department’s annual billing for the
next fiscal year. An application for a new transfer station,
material recovery facility or composting facility shall include
the applicable permit or registration compliance fee for the
first year of operation. |
| Waste Tire Management: Reference: OAR
Chapter 340, Division 64. |
See Reference |
Solid Waste Treatment Facility or Landfill:
Reference: OAR 340-097-0110 and 340-097-0120. |
See Reference |
Questions about fees?
|
If you have any questions or need more information, please contact
the regional solid waste permit coordinator in your area.
Oregon Administrative Rules (OAR) and Oregon Revised Statutes
can be found on the Laws and Regulations web page (see link
above). |
|